METRANS DYKO Rail Repair Shop s.r.o.

Kolín
About the project

All operation in paint shop are done manual (high pressure washing, painting).

Degreasing takes place in a high pressure washing booth. The equipment of the booth consists of rails for the transport of wheelset, a sloping floor with a drain to the collection tank, lighting and exhaust air conditioning. The exhaust air technology is supplemented by a supply air handling unit to replace the exhaust air. The booth has an entrance and exit rolling gate.

Degreasing is done by hand spraying the concentrate on the parts, which are left to act (due to heavy soiling). Subsequently, the parts are rinsed with hot high-pressure spray, which is circulating in the first phase, and for the final rinsing and replenishment of the evaporation, a high-pressure spray is performed with water from the tap. After rinsing, water is blown out of the joints and pockets with compressed air and the parts are allowed to dry freely.

Sprayed water, dirt and degreaser run down the floor, which slopes into the floor channel. From the channel, the water flows into the collection tank, where it accumulates and is pumped to the belt filter. The heaviest particles sediment in the collecting tank. Mechanical impurities are separated on the belt filter. From the belt filter, the filtrate flows into the operating tank, where fine dirt settles further and the water is pumped through a bag filter into the high-pressure machine. If the operating tank is full, the flow of water from the collecting tank is automatically led to the waste water tank. The high pressure machine is equipped with gas heating. The device is also prepared for the use of Fe-phosphating bath, or circulating degreasing with an alkaline degreasing agent.

After evaporation of water from the parts, painting with liquid paints follows. The painting booth is equipped with an inlet and outlet rolling door, lighting and supply and exhaust air conditioning ensuring the required descending speed. Exhaust air conditioning is equipped with floor filtration.

PHOTOGALLERY
View the embedded image gallery online at:
https://www.ekol.cz/en/references/dyko-kolin-en#sigProId1e94109c4d
How cooperation works:
1. Initial appointment

1. Initial appointment

Obtaining the requirements.

next-step
2. Analysis

2. Analysis

Analysis of customer needs.

next-step
3. Solution proposal

3. Solution proposal

Desing of the technology and equipment.

next-step
4. Delivery

4. Delivery

Manufacturing, assembly, commissioning, handover, service.

DO YOU NEED TO CONSULT YOUR SELECTION?
Send us your requirements and we will design the technology and equipment.
Prosím vyplňte všechny povinné pole.
Prosím vyplňte všechny povinné pole.
Prosím vyplňte všechny povinné pole.
EKOL s.r.o.

Marie Majerové 1152, 
CZ 584 01 Ledeč nad Sázavou
Tel.: +420 569 721 303, +420 569 721 179
Fax: +420 569 721 313
E-mail: info@ekol.cz

Please complete all required fields.
Please complete all required fields.
Please complete all required fields.